Step-By-Step Installation Video
Step-By-Step Installation Guide
Step 1
Count the treads and divide by 7 for your spacing.
Step 2
Hold the inner C-Clamp.
Step 3
Slide inner C-Clamp onto the inner side of the track until snug. If needed, use a mallet or pry bar to make sure it is snug. This needs to be snug to ensure you have enough slack to properly align the bolt in the outer C-Clamp.
Step 4
Hold the outer C-Clamp
Step 5
Step 5b
Step 6
Step 7
Once all 7 chains are properly spaced, aligned, and tightened (snug across the track) on each track, and you have double-checked the clearance between the machine and the chains, you are finished.
$1,199.00 - $1,324.00
- 14 chain sections in each set (7 per side)
$1,199.00 - $1,324.00
- 14 chain sections in each set (7 per side)